PRECASTSLAB + (GRS-IBS) = ABC

January 27, 2017

The following is a magazine article that was published in the June 2015 Florida Engineering Society Journal and the May 2014 PCANY Newsletter. It was written by Ralph Verrastro, PE and is titled PRECASTSLAB + (GRS-IBS) = ABC. The article provides a case study for the successful application of Accelerated Bridge Construction (ABC) techniques on a FDOT design build project for the replacement of Rock Ridge Road Bridge over Gator Canal in Polk County, Florida.. Send any questions or comments regarding this article to Ralph at ralph@bridging-solutions.com or call him at 239-216-1370.

 

 

 

 

 

 

Please reload

Featured Posts

PRECASTSLAB + (GRS-IBS) = ABC

January 27, 2017

1/5
Please reload

Recent Posts

August 8, 2019

July 10, 2019

September 4, 2018

February 27, 2018

September 22, 2017

July 17, 2017

Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Classic
  • Twitter Classic
  • Google Classic

Bridging Solutions, LLC / T 239.216.1370 / ralph@bridging-solutions.com / © 2013 by Bridging Solutions, LLC.  Proudly created with Wix.com