- Ralph Verrastro, PE
PRECASTSLAB + (GRS-IBS) = ABC
The following is a magazine article that was published in the June 2015 Florida Engineering Society Journal and the May 2014 PCANY Newsletter. It was written by Ralph Verrastro, PE and is titled PRECASTSLAB + (GRS-IBS) = ABC. The article provides a case study for the successful application of Accelerated Bridge Construction (ABC) techniques on a FDOT design build project for the replacement of Rock Ridge Road Bridge over Gator Canal in Polk County, Florida.. Send any questions or comments regarding this article to Ralph at ralph@bridging-solutions.com or call him at 239-216-1370.




